Ukraine: Tashlyk GAPP: Construction of 2 hydroelectric units (216.5 MW each). Tashlyk GAPP: Construction of 2 hydroelectric units (216.5 MW each).
Georgia: Mtkvari River: Construction of a 65 MW hydroelectric power plant Reconstruction Projects: Modernization of a hydroelectric power plant (23 MW).
Nigeria: Reconstruction Projects: Modernization of a hydroelectric power plant (23 MW). Adamawa State: Construction of an irrigation reservoir.
Egypt: Aswan: Reconstruction of 12 hydroelectric units, increasing capacity from 180 MW to 200 MW each.
Tajikistan: Nurek: Overhaul of the ball shutter of the hydroelectric unit No.8.Baipasin: Reconstruction of hydroclapan bypass with a hydraulic drive on four disk shutters (150 MW each).